facebook TPPT
youtube TPPT
Tarnobrzeska Przestrzeń Przyszłych Technologii
Tarnobrzeska Przestrzeń Przyszłych Technologii
Tarnobrzeski Industrial – Technological Park
Technology
Technological Incubator
Industrial zone - Productive Hall

Industrial zone - Productive Hall

The hall building is a single-storey facility with a rectangular footprint, constructed using prefabricated reinforced concrete construction technology.

 

 

The exterior wall is constructed from lightweight wall layers. In terminal bays, two-storey brick auxiliary buildings are located with staff/office rooms in direct contact with the production hall. The building is divided into three production-warehouse use sectors with the following floor areas:

Usage area

Sector 1

882.30 m2

Usage area

Sector 2

868.20 m2

Usage area

Sector 3

880.00m2

TOTAL HALL

2,630.50m2

The hall has 6 entrances, (two for each sector), 5.0 x 6.0 m in dimension. The production area possesses surface-hardened concrete flooring. Each sector is separately metered and charged for heat and electricity use.

The building is equipped with the following systems: water-sanitation, central heating, natural gas, mechanical ventilation, electrical, telephone and internet, industrial television, and additionally, in the administrative/staff rooms – a cooling system. Warm water is heated with renewable energy – solar collectors. The building is equipped with its own boiler station.

Basic building parameters:

  • external building area – 3,076 m2,
  • first floor usable space – production and social areas 2,976.88 m2,
  • second floor usable space – office space 301.06 m2,
  • total useable space 3,277.94 m2,
  • volume – approx. 33,400 m3,
  • building height – 11.30 m,
  • minimum ceiling height – 9.00 m.

The hall building has a Class “D” fire resistance classification. A total of approx. 60 people may be employed in the production hall (including handicapped persons).

The hall facility is available for lease. Only innovative technologies which do not have negative environmental impacts may be located here, however.

to obiekt w zasadzie dwukondygna

Newsletter

Sing up now! You will be receiving snapshots of most recent news from TPPT!

Calendar

◄◄
►►
November 2024
Mon Tue Wed Thu Fri Sat Sun
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Contakt details

Tarnobrzeg Industrial & Technology Park
Aleja Warszawska 227A
Tarnobrzeg, 39-400
Poland
+48 15 848 18 00
This email address is being protected from spambots. You need JavaScript enabled to view it.
Europejski Fundusz Rozwoju Regionalnego